Mr. Collison is the President of Industrial Systems. Troy has experience in PLC and HMI design and programming, project management, and construction inspection. Project fields include bulk material handling, detention facility systems, water and wastewater SCADA and control systems, and many different industrial process control and automation applications. Troy's automation and SCADA projects have included many brands of programmable controllers and computer graphic interface systems, and have operated from simple pump stations to entire manufacturing facilities and municipal districts.
Credentials
Education & Certifications
Education
- ITT Technical Institute, Associate Applied Science
Affiliations
- ISA
- ACEC
- AWWA
- Consulting Engineers Council of Oregon
Expertise
Areas of Expertise
-
SCADA & PLC Programming
Multi-platform PLC and HMI design across Allen-Bradley, Siemens, and other major brands
-
Project Management
End-to-end oversight of controls engineering projects from design through commissioning
-
Water & Wastewater Systems
Municipal SCADA and control systems for treatment plants, pump stations, and districts
Project Experience
Featured Projects
Projects Troy has contributed to.
-
Water Treatment | Duvall, WACity of Duvall — SCADA Master Plan & Water System Improvements
SCADA Master Plan development and full system implementation including Wonderware SCADA, PLC-based RTUs, private cellular network, and chlorine monitoring for the City of Duvall's water system.
-
Water Treatment | Scappoose, ORCity of Scappoose — SCADA for Water Filtration
New SCADA systems for two water treatment plants with matching interfaces and independent resiliency, implemented with zero downtime using Tridium Control Microsystems PLC.
-
Water Treatment | Stayton, ORCity of Stayton
50% facility expansion with a PLC-5 to ControlLogix migration, fiber optic ring network, and modular Wonderware SCADA programming with reusable control and HMI blocks.
-
Wastewater | Vancouver, WADiscovery Corridor
Detail design and supply of PLC and VFD control systems for five wastewater pump stations connecting Ridgefield to the Clark Regional WWTP, including 200 HP 18-pulse drives.
-
Water Treatment | Portland, ORGasco
Complete SCADA system design for a groundwater treatment facility — from initial manual control to fully automated, unattended 24-hour operation with redundant remote access.
-
Industrial | Pocatello, IDGreat Western Malting
Fast-track control system design for a new malting facility — 100 VFDs, nearly 2,000 I/O points, and a multi-level fiber network delivered within an 18-month construction schedule.
-
Public Facilities | Grants Pass, ORJosephine County Juvenile Detention Facility
Complete door control system replacement for a juvenile detention facility — from proprietary toggle switches to a modern PLC and touchscreen HMI with integrated intercom control.
-
Industrial | Long Beach, CALongbeach Export Terminal
Full PLC and HMI replacement at a bulk handling export terminal loading 50+ vessels per year — completed with zero planned downtime using a side-by-side migration approach.
-
Water Treatment | Sunnyside, WARoza Irrigation District
PLC-based control system design and SCADA integration for a 1,600 acre-foot re-regulation reservoir with five vertical turbine pumps and remote monitoring via cellular and radio links.